Stay prepared this flood season: Note from County Councilwoman Julia Patterson

I’m pleased to share good news with you – President Obama recently signed legislation that funds improvements to strengthen the Howard Hanson Dam, reducing the risk of flooding to the Green River Valley. The funding allows the dam’s operator, the U.S. Army Corps of Engineers, to complete repairs by the 2011/2012 flood season.

King County Councilwoman Julia Patterson.

King County Councilwoman Julia Patterson.

I’m pleased to share good news with you – President Obama recently signed legislation that funds improvements to strengthen the Howard Hanson Dam, reducing the risk of flooding to the Green River Valley. The funding allows the dam’s operator, the U.S. Army Corps of Engineers, to complete repairs by the 2011/2012 flood season. Once these measures are in place, the Corps believes that the dam could be operated at full flood-control capacity for decades.

Storms in January 2009 weakened the dam, causing the Corps to restrict the water level in the reservoir behind the dam and increasing the risk of flooding in the valley. Given the significant public safety and economic threat that a weakened Howard Hanson Dam would cause, the King County Flood Control District, along with the Corps, Governor Gregoire, King County and valley city elected officials, quickly came together to prepare for the potential impacts of flooding and to advocate for emergency repairs.

Our local congressional delegation responded and we are very appreciative of their efforts to secure the necessary funds to provide additional repairs. The repairs will provide critically needed protection and time for the Corps to evaluate whether additional long-term repairs are necessary. We must all continue to be diligent to protect the people, businesses and infrastructure of the Green River Valley and to minimize devastating economic impacts from potential floods.

What does this mean for you?

While last year’s temporary improvements were successful at lowering the risk of flooding in the Green River Valley, the dam will continue to operate at a limited capacity during the upcoming 2010/2011 flood season. Therefore there is still a heightened risk of flooding. It is important for you to get ready and stay ready.

Buy flood insurance, if you have not already done so;

Establish or update an emergency plan for your family, business, pets or livestock; and

Have emergency supplies on hand.

Please help us spread the word about the continued risk of flooding during the 2010/2011 flood season and the importance of being prepared. Share this information with your family, neighbors, friends and coworkers.

For more flood preparedness information, please go to www.kingcounty.gov/floodplans.

If you have questions or comments please contact info@kingcountyfloodcontrol.org. For information about the King County Flood Control District please go to

If you have questions or comments please contact www.kingcountyfloodcontrol.org.


Talk to us

Please share your story tips by emailing editor@kentreporter.com.

To share your opinion for publication, submit a letter through our website https://www.kentreporter.com/submit-letter/. Include your name, address and daytime phone number. (We’ll only publish your name and hometown.) Please keep letters to 300 words or less.

More in News

COURTESY PHOTO, City of Kent
Most Kent city streets now open as river levels go down

West Valley Highway, South 277th Street among the roads that reopen

A city Public Works crew member places a sandbag early in the week of Dec. 15. COURTESY PHOTO, City of Kent
Several city of Kent streets remain closed Dec. 19 due to flooding

City road closure list as of Friday afternoon, Dec. 19

t
NB SR 167 reopens in Kent, Auburn | Update

WSDOT announces all lanes are open along 6-mile stretch

t
Falling trees damage King County pet shelter in Kent

Cats are fine but Regional Animal Services limits operations

t
Community steps up in Kent to rescue animals at Briscot Farm

Twenty-two animals saved from floodwaters near 78th Avenue South and South 277th Street

Howard Hanson Dam along the upper Green River that helps control flooding in Kent, Auburn, Renton and Tukwila. FILE PHOTO, Army Corps
Army Corps adjust Hanson Dam flows to combat Green River flooding

Dam helps control flooding in Kent, Auburn, Renton and Tukwila

File Photo, Kent Reporter
Kent Police officer reportedly fired 5 shots at suspect in apartment

Early investigation reveals more details during Dec. 10 incident at Indigo Springs Apartments; nobody injured

t
Regional Animal Services in Kent limits operations at shelter

Potential flooding causes King County to ask residents not to visit facility until risk over

t
MLK Jr. Way street name to extend to Renton, Kent from Seattle

Washington State Transportation Commission approves proposal by Kent’s Gwen Allen-Carston

Courtesy Photo, Washington State Patrol
Kent pedestrian killed in hit-and-run along SR 516

Kent man, 55, dies at scene Saturday night, Dec. 13 near West Meeker Street as vehicle flees

A breach in the Desimone Levee along the Green River on Dec. 15 in Tukwila. SCREENSHOT/Video, Courtesy King County Sheriff’s Office
Green River levee breach impacts small areas of Kent, Renton and Tukwila

Levee breach video released; evacuation notice lifted Monday evening by King County